From Sound Transit's timetable and fare pages, City of Bellevue project pages, and plat's own count of apartments near each station. Service details are as of the timetable that runs to 26 March 2027.

Six light rail stations sit inside Bellevue, from South Bellevue at I-90 to BelRed at 130th Avenue. Since 28 March 2026 the trains also cross Lake Washington, so downtown Bellevue is 22 minutes from International District/Chinatown and 19 minutes from Downtown Redmond.

$3any ride, tap once on the way in
8–10 minbetween trains on weekdays
22 minBellevue Downtown to International District
6stations inside Bellevue
Mercer IslandMercer IslandSouth BellevueSouth BellevueEast MainEast MainBellevue DowntownBellevue DowntownWilburtonWilburtonSpring DistrictSpring DistrictBelRedBelRedOverlake VillageOverlake Village
The 2 Line's six Bellevue stations, filled, inside the city limit (shaded). Mercer Island and Overlake Village, hollow, are the stops on either side. Sources: King County GIS: Administration/KingCo_AdministrativeAreas (cities and unincorporated areas) and Hydro/KingCo_Hydrographic (lakes and large rivers); station positions from OpenStreetMap via Overpass.

Riding it

Paying

Tap an ORCA card on the reader before you go down to the platform. Since 23 February 2026 the same readers also take a contactless Visa, Mastercard, Discover or Amex card, or a phone with Apple Pay, Google Pay or Samsung Pay. You do not tap out. An adult ORCA card costs $3 from the ticket machine in any station.

WhoFare
Adult$3, any distance
18 and underFree
65 and over, or with a disability$1 with a Regional Reduced Fare Permit
Low income (ORCA LIFT)$1
Day pass$6 adult, $2 reduced

A bank card or phone always pays the adult fare, one rider per card. Reduced fares need an ORCA card issued for them. Metro buses also cost $3, and a fare counts toward any bus or train you board within two hours.

How often trains come

Every 8 minutes at weekday rush hour (5 to 9 a.m. and 3 to 7 p.m.), every 10 minutes the rest of the weekday, and every 10 to 12 minutes on weekends. Sound Transit's station pages say "every 4 to 5 minutes"; that is the Seattle stretch north of International District, where the 1 Line and 2 Line share track.

Where it goes

From Bellevue Downtown toMinutes
South Bellevue7
Mercer Island11
Redmond Technology (Microsoft)12
Downtown Redmond19
International District/Chinatown22
Westlake (downtown Seattle)27
University of Washington34
Lynnwood City Center59

The airport, games and the UW

The 2 Line does not go to the airport. Ride to International District/Chinatown, change platforms, and take the 1 Line south for 33 more minutes to SeaTac/Airport. From the Bellevue Downtown platform, allow about an hour and ten minutes (our estimate from the two timetables, not a Sound Transit figure).

For Seahawks, Sounders and Mariners games, get off at International District/Chinatown and walk; the 2 Line skips Stadium station. For Husky Stadium, the University of Washington stop is next to it.

After midnight

The last train toward Redmond leaves Westlake about 12:25 a.m. on weeknights and 11:40 p.m. on Sundays. After that, Sound Transit's Night Bus 547 runs from downtown Seattle through Bellevue to Redmond about every 30 minutes.

Bikes and parking

Bikes ride at the middle doors marked with a bike, up to six a car. Rented Lime scooters and bikes are not allowed on board. South Bellevue has the only garage, 1,524 free spaces; BelRed has a 300-space lot. The other four stations have drop-off zones only.

The six stations

Listed south to north. The apartment count is buildings the King County Assessor lists as apartment complexes, reached on foot along real streets from the platform, each counted once at its nearest station. Condominiums and houses are not included, so it understates how many people live nearby.

South Bellevue station, April 2024
1 of 6

South Bellevue

The park-and-ride
Platform
Elevated, one island platform
Parking
1,524-space garage, free
Buses
Metro 111, 203, 226, 240, 249; ST 556
Apartments within a 10-minute walk
None

On Bellevue Way at the edge of Mercer Slough, over the park-and-ride Metro opened here in 1981 with 337 stalls. No apartment building is within a ten-minute walk; the nearest is a 44-unit complex from 1957, inside fifteen. The garage fills early on game days, and a $6 event permit holds a space if booked up to four weeks ahead.

East Main station, May 2024
2 of 6

East Main

The tunnel's south end
Platform
At ground level, two side platforms
Parking
None; drop-off on 112th Ave SE
Buses
Metro 220, 240, 249
Apartments within a 10-minute walk
1,065 in 8 buildings

On 112th Avenue SE between the denser blocks north of Main Street and the single-family houses of Surrey Downs to the south. Sound Transit is handing the city about two acres over the tunnel portal for a park between them. Route 220, new in August 2026, runs from here to Lake Hills, Bellevue College and Eastgate every 15 minutes on weekdays.

Bellevue Downtown station, opening day, April 2024
3 of 6

Bellevue Downtown

The busiest Bellevue stop
Platform
Two side platforms, at the tunnel's north end
Parking
None
Buses
Bellevue Transit Center, one block west: RapidRide B Line and most downtown routes
Apartments within a 10-minute walk
3,286 in 22 buildings

Along NE 6th Street between 110th and 112th, next to City Hall. More apartments sit within ten minutes on foot of this station than of the other five combined. Half the transit center is closed until January 2027 while it is rebuilt for Stride, so some buses stop on NE 6th and 110th instead.

Wilburton station, July 2025
4 of 6

Wilburton

The least used stop on Link
Platform
Elevated, one island platform
Parking
None; drop-off off NE 8th St
Buses
RapidRide B Line; Metro 226, 250
Apartments within a 10-minute walk
70 in 2 buildings

On NE 8th Street just east of I-405, beside Overlake Medical Center. In April 2026 it had 931 boardings a weekday, the fewest of any Link station. It is also where the city has planned the most change: a 2025 rezone covers about 300 acres, with the tallest buildings allowed between I-405 and the Eastrail trail, which crosses NE 8th on a 2024 bridge straight to the platform.

Spring District station, April 2024
5 of 6

Spring District

The office district
Platform
Below street level in a trench, two side platforms
Parking
None; drop-off on 120th Ave NE
Buses
Metro 226, 249
Apartments within a 10-minute walk
234 in 2 buildings

Between 120th and 124th Avenues, in a 36-acre district built on former industrial land. REI built its headquarters here and never moved in; Meta bought it in 2020 and gave up its rights to five more blocks in 2025. The platform walls carry Louie Gong's Dragon and Phoenix, one on each side.

BelRed station, April 2024
6 of 6

BelRed

The newest neighbourhood
Platform
In the median of NE Spring Blvd, two side platforms
Parking
300-space surface lot
Buses
Metro 226
Apartments within a 10-minute walk
1,112 in 4 buildings

At 130th Avenue NE. All four apartment buildings within walking distance opened in 2021 or later. In September 2025 the city chose developers for the land beside the station: BRIDGE Housing for at least 172 income-restricted homes, and Su Development for mixed-income housing with a 302-space garage to replace the surface lot.

How the route was chosen

Sound Transit wanted the line up Bellevue Way to the South Bellevue park-and-ride and then along 112th Avenue SE, past the Surrey Downs neighbourhood, which had voted hardest in Bellevue against the 2008 measure that paid for it. A council majority elected in 2009, backed by Kemper Freeman, whose company owns Bellevue Square, wanted it east of Mercer Slough along I-405 and the old BNSF railway instead, a route called B7. Sound Transit's studies found B7 cost more, crossed more wetland, served fewer homes and jobs, and skipped the park-and-ride. Sound Transit's route won, and the city paid to put the downtown section underground.

WhenWhat happened
1976The state and the I-90 cities agree two lanes of I-90 will be kept for transit and built to carry rail one day
Nov 2008Voters approve Sound Transit 2, which funds East Link and promises trains to Bellevue by 2020
Mar 2010Bellevue's council backs the B7 route, 4 to 3
Mar 2011The Seattle Times reports that councilmember Kevin Wallace, who drew up his own B7 route, had a company sign a preliminary deal with a railroad seeking the same corridor. An investigator clears him that July
Apr 2011The Washington Supreme Court rejects Freeman's first suit, which argued highway money could not put rail on I-90
Jul 2011Sound Transit adopts the 112th Avenue route, with a downtown tunnel if Bellevue pays up to $160 million
Nov 2011Claudia Balducci, the council's leading rail supporter, beats a Freeman-backed challenger with 66%. Six days later the council approves the tunnel deal, 7 to 0
2013A federal suit over Mercer Slough fails, the state Supreme Court rejects Freeman a second time, and a redesign moves the downtown station to the tunnel's north end
2015Bellevue's share of the tunnel is fixed at $100 million; opening is set for June 2023
Apr 2016Construction starts
Jul 2018The downtown tunnel, mined in short sections rather than bored, is dug five months early
2022–235,455 concrete blocks holding the rails on I-90's fixed spans are found defective and must be rebuilt, delaying the lake crossing
Apr 2024Trains start between South Bellevue and Redmond Technology, without the lake crossing
May 2025The line reaches Downtown Redmond
Mar 2026Trains cross Lake Washington on the I-90 floating bridge, which Sound Transit bills as the first light rail on a floating bridge

The project's budget ended at $3.82 billion, 3.8% above the figure set in 2015. In 2023, at the city's request, two stations dropped their street numbers: Spring District/120th became Spring District and BelRed/130th became BelRed.

What comes next

WhenWhat
Jan 2027Bellevue Transit Center fully reopens after its rebuild for Stride
Mid-2027Eastrail's Wilburton Trestle opens, delayed from 2026 after decay was found in the timber
Summer 2027I-405 express toll lanes from Renton reach Bellevue, nearly two years late
2028Stride S1 bus rapid transit, Bellevue to Renton and Burien on I-405
2029Stride S2, Bellevue to Kirkland, Bothell and Lynnwood
Fall 2030RapidRide K Line: Totem Lake, Kirkland, downtown Bellevue, Bellevue College, Eastgate
2030Grand Connection, a walking and cycling crossing over I-405 from City Hall to Eastrail
2031Eastrail's last Bellevue gap closes at I-90
2050Light rail from South Kirkland to Issaquah through downtown Bellevue

Stride will change the most trips. Both lines start at the Bellevue Transit Center, a block from the train, and run every 10 to 15 minutes on double-decker electric buses. The 2016 plan promised them for 2024.

Two of these are not fully paid for. The K Line needs a federal grant that was rated "medium-high" in April 2026 but has not been awarded. The Grand Connection is costed at $175 million to $230 million, and the city has identified about $115 million of it.

The Issaquah line moved to 2050 when Sound Transit's board revised its plan on 28 May 2026 to close a $34.5 billion funding gap. It would share the Bellevue Downtown, East Main and Wilburton stations and add Bellevue stops at Richards Road and Eastgate. Sound Transit's own project page still says 2041.

Shared scooters and e-bikes are already here. Lime started citywide service on 10 August 2026 with 350 scooters, 50 e-bikes and 100 seated scooters.

What would change these numbers

Service levels and fares are Sound Transit's for the timetable running to 26 March 2027. The walking counts come from OpenStreetMap streets and the Assessor's apartment list as of September 2026; a new building, a closed path or a new crossing of I-405 moves them. The ten-minute band is 800 metres of walking. Opening years under "What comes next" are each agency's current date, and four of them have already moved once.

Sources

Service and fares: Sound Transit's 2 Line timetable (effective 29 August 2026), fares, station pages and parking permits; myORCA Tap to Pay; King County Metro prices. Wilburton's April 2026 boardings: Seattle Transit Blog, from Sound Transit data.

History: the Washington Supreme Court's opinion in Freeman v. State (2013), which sets out the 1976 I-90 agreement; Bellevue City Council minutes of 8 March 2010 and 14 November 2011; Sound Transit's 2011 route decision, 2013 refinements, tunnel excavation and Resolution R2026-01 (schedule and budget history); the City of Bellevue on the 2015 agreement; contemporary reporting in Seattle Met, Patch and Seattle Transit Blog.

What comes next: Sound Transit on Stride and the 2026 ST3 plan; King County on the K Line and Eastrail; WSDOT on I-405 Renton to Bellevue; the City of Bellevue on the Grand Connection, Wilburton, BelRed developers and Lime.

Apartments near each station: King County Assessor apartment-complex extract, selected by parcel to Bellevue, routed on OpenStreetMap streets as of 29 August 2026.

New stories from Bellevue, in your inbox

One email when a new story is published, with any corrections. Nothing else.