Subscribe
← Places

Factoria Mall: its shops, T&T and the apartments to come

By Brian H. Liou · Drafted with Claude · Published 24 October 2026 · Updated 3 November 2026

6.1 million
visits to the mall in 2024, a CoStar estimate
7,800
people working in Factoria, by the city's count
A third
of the independent food places are Chinese and Taiwanese
265
apartments in Phase 1, approved 2024; no building permit since
Land zoned for the mall (F-1)Phase 1 apartments siteFactoria VillageT-Mobile’s five headquarters buildings
North-up 2023 aerial of Factoria: I-90 across the top, I-405 curving down the left, the mall's roofs and parking lots in the middle west of Factoria Boulevard SE, a shopping plaza and office towers to the north-east, school playing fields to the east, and houses around the edges.Factoria’s commercial corner and its neighbors, between I-90, I-405 and Tyee Middle SchoolAerial photograph with I-90 across the top and I-405 curving down the left. A gold line outlines the mall land south of SE 38th Street between Factoria Boulevard SE and 124th Avenue SE. The Phase 1 apartment site is the dashed northwest corner; T&T is the large box at the south end. North of SE 38th Street, a green outline marks Factoria Village, anchored by QFC, and blue outlines mark T-Mobile's five headquarters buildings east of it. An optional second layer draws the city's neighborhood areas (Factoria, Eastgate, Newport, Woodridge, West Bellevue, Somerset), the AMC Factoria 8 cinema, Tyee Middle School and the former Puesta del Sol Elementary campus to the east, and arrows to Woodridge Elementary, Newport High School and Somerset Elementary beyond the frame.I-90I-405Factoria Blvd SESE 38th StPhase 1Factoria MallT&TFactoria VillageT-Mobile HQN ↑WOODRIDGEWEST BELLEVUEEASTGATENEWPORTFACTORIA↑ Woodridge Elementary, 2.0 km↓ Newport High School, 0.7 kmSomerset Elementary, 1.9 km ↘Tyee Middle SchoolFormer Puesta del Sol ElementaryAMC Factoria 8
Factoria from above on 7 October 2023, north up, about 1.9 km across (2.2 km with the neighborhoods layer). Gold: the parcels the city zones Factoria 1 (F-1), the mall with its lots and pads; T&T fills the old Walmart box. Green: the parcel under QFC, which the city’s Existing Conditions report (January 2026) names as Factoria Village’s anchor. Blue: the five buildings OpenStreetMap names as T-Mobile’s, around 12920 SE 38th Street, the headquarters address in its 2025 annual report. The second layer adds the city’s neighborhood areas, nearby schools and AMC Factoria 8; distances to schools beyond the frame are from the middle of the mall. City of Bellevue map layers read 20 October 2026; outlines include parking and are not lease lines.

Factoria is the commercial corner of south Bellevue where I-90 meets I-405. It's an office district first: the city counts about 7,800 people working there, and T-Mobile has its headquarters on SE 38th Street. Between the offices sit a mall, Factoria Village and a string of smaller centers along Factoria Boulevard SE and SE 38th Street, and that's where most of the eating happens. The mall, which the city's reports call Factoria Mall and its owner Kimco calls The Marketplace at Factoria, drew about 6.1 million visits in 2024, a CoStar estimate the city's January 2026 report cites.

Seen from above, the mall is low roofs in a field of parking, with I-405 along its west side and the office blocks between it and I-90. The first phase is planned for the northwest corner, still parking and a restaurant in mid-October.

Around the mall: T&T, big-box stores, banks, clinics and a cinema

T&T fills the building Walmart left

T&T Supermarket opened in December 2024 in the 76,000 sq ft space Walmart had left. It's the chain's first store in the United States, and the city's January 2026 report lists it as an anchor beside Target and Amazon Fresh. The latter closed the next month.

Two shopping centers, and the banks and clinics along the boulevard

This part of Factoria is for errands: groceries, a bank, a doctor, a haircut. The mall and Factoria Village, across SE 38th Street, are separate shopping centers, with smaller strips along the boulevard between them.

Along the boulevard, the report notes "a high concentration of dental clinics, medical offices, and personal wellness businesses", and OpenStreetMap bears it out:

A third of the independent food places are Chinese and Taiwanese

The county's food-permit list puts 54 restaurants, bakeries and grocers in Factoria. Chinese and Taiwanese food is the largest single group among the independent places, at about a third, and it was here before T&T. Few of those places are new.

The full count and every name are under "How this was checked".

Mini golf, swim lessons and festivals draw families

Several of the mall's tenants are there for children. Monster Mini Golf runs a glow-in-the-dark course with an arcade, Funtastic Playtorium is an indoor playground and Goldfish Swim School teaches lessons. Magikid Robotics Lab signed a mall lease in 2024, and Kumon, Sylvan, C2 Education and Eye Level teach nearby. The AMC Factoria 8 cinema stands on its own lot north of SE 38th Street.

Local groups, more than the mall itself, run its events: the Emerald Parents Association's Lunar New Year fairs on 1 February 2025 and 28 February 2026, Little Masters Club's Mid-Autumn "Moonlight Melodies" of Chinese music, dance and mooncakes on 4 October 2025, and Seattle Bazart's three-day Merry K-ristmas Market of Asian-owned vendors in December 2025. Halloween Factoria, a trick-or-treat, was set for 31 October 2026. Each was a single day or weekend. The city's draft plan asks for more, in policy S-F-N16: "collaborate with Factoria Mall" on "community gathering and events".

What's changing: an approved plan to rebuild the mall

The approved plan allows homes, a hotel and offices; Phase 1 is 265 apartments

On 5 November 2020 Bellevue approved Kimco's master development plan, 18-105710-LP, which sets the uses, building limits and required improvements for the site; each phase still needs its own design review. As changed in January 2022, the approved scheme has 595 homes, a 150-room hotel and 203,384 sq ft of offices. Kimco's June 2026 investor report puts Factoria among its long-term approved opportunities, outside the group it expects to start or sell within three years, and gives no start date.

Phase 1 is the apartment building at 12405 SE 38th Street, on the mall's northwest corner, which received design review approval on 4 April 2024: one five-story building with 265 apartments around a courtyard and a garage inside, with shops and an office on the ground floor facing a surface lot to the south. Under the city code the approval cites, it expires after two years unless a complete building permit application is filed first, and searches of the city's permit portal and records found no building permit application since. On 16 October 2026 the corner was still parking and the Novilho's building.

Phase 1 site, 12405 SE 38th StBuilding (approximate)Surface lotNew walking and cycling trail, 14 ft wide
North-up aerial of the mall's northwest corner in October 2023: a restaurant building and parking between SE 38th Street and 124th Avenue SE, with I-405 to the west and the mall's roofs to the south-east.The approved Phase 1 apartments at 12405 SE 38th StreetAerial of the mall's northwest corner. A gold line marks the 5.3-acre site between SE 38th Street and 124th Avenue SE. The northern part, hatched orange, is the five-story building with 265 homes; its south face holds shops, an office and the main entry. The southern part is a 155-stall surface lot. A green line along 124th Avenue SE is the new walking and cycling trail, 14 feet wide, starting at a widened, signalized crossing halfway along the building's west side.New building5 stories · 265 homesshops, office, main entrySurface lot155 stallscrossing widenedand signalized14-ft-wide trailSE 38th St124th Ave SEFactoria MallN ↑
Our drawing of the plan approved on 4 April 2024 (city file 22-130386-LD), on a 7 October 2023 aerial. The site outline is the city’s parcel for 12405 SE 38th Street, read 20 October 2026; the building’s extent is traced by eye from the approved site plan (PDF page 21) and is approximate. Untick the box to see the corner as it is: parking and the Novilho’s restaurant building, which the plan demolishes.

The approved phase map, from January 2022, still puts offices on T&T's building. Its Phase 7 takes down the Walmart building, which T&T now fills, and the shops north of it, for two office buildings, 202 homes, a garage and an extension of Target. The map was drawn before T&T opened, and we have found no later amendment. That is what the plan allows, not a schedule: the phase numbers are labels rather than an order, and nothing in the records dates any phase after the first.

The details of the master plan, Phase 1 and every phase are under "How this was checked".

What's empty and what's coming

Kimco, which owns the mall, reported it 95.4% leased at the end of 2022 and 89.6% at the end of 2025. That's the owner's own figure for space under lease in its center, not a count of open storefronts, and the 2025 figure is dated a month before Amazon Fresh closed.

A dark shop can be waiting for a tenant, or already being rebuilt for one. The photos and permit records distinguish those states; they don't establish a mall-wide vacancy count.

Space and former useState now, with dateWhat is known about next use
Former Amazon Fresh grocery storeLast day 1 February 2026, per AP and GeekWire; dark in our 16 October 2026 photoNo replacement tenant or opening date confirmed in the page's records checked 20 October 2026
East-side retail unitsDark windows and Kimco's Space Available banner in our 24 October 2026 photo; previous tenants not identifiedOffered for lease on the 24 October 2026 banner; no next tenant named there
Concourse kioskEmpty, with Kimco's leasing sign, in our 24 October 2026 photo; previous operator not identifiedOffered for lease on the 24 October 2026 sign; no next operator named there
Former Ricardo's restaurant, now KPOT fit-outKPOT had not opened by 24 October 2026; interior permit issued in February 2026Korean barbecue and hot pot; facade permit still pending at the 20 October 2026 portal check; no opening date confirmed
Former Rite Aid, 3905 Factoria Square Mall SEWindows sheeted and a lift inside in our 24 October 2026 photoInterior demolition issued 7 August 2026; roof permit issued 6 October; facade under review at the 20 October check. No tenant named

The neighborhood area plans the Council is to review follow the Planning Commission's recommendation after its 23 September hearing. The policy text includes limiting small-business displacement during redevelopment and changes no zoning.

How the mall got here

Factoria was named for factories that never came. Local histories say a land company platted the town in 1908 and renamed it Factoria by 1911. The highway to Seattle was widened through it in 1939–40, and by 1951 the ground by today's interchange held the Sunset Shopping Center and a 900-car drive-in. The mall opened south of them in 1976–77 (sources differ on the year), and Bellevue annexed the area in 1993.

  1. 1976–77The mall opens, with Safeway and Pay'n Save among its first stores
  2. 1987Mervyn's and Target open
  3. 1997Ernst Home Center closes; Nordstrom Rack opens
  4. Nov 1998A face-lift is announced: skylights, a courtyard, a new west entrance
  5. Dec 2004Kimco buys the mall in a joint venture, for about $100 million
  6. About 2006Mervyn's leaves
  7. Oct 2012Walmart opens in Mervyn's old space
  8. Nov 2020The city approves Kimco's master plan
  9. Apr 2022Walmart closes
  10. Jun 2023T&T announces its first U.S. store, in the Walmart space
  11. Apr 2024Phase 1 apartments clear design review
  12. May 2024Kimco announces new leases: Holiday China, Sam Income Tax, Sushi Omiya, Magikid Robotics Lab
  13. Dec 2024T&T opens
  14. Fall 2025City planners set up a table at the mall's Mid-Autumn Festival
  15. Feb 2026Amazon Fresh closes; KPOT's permit for the old Ricardo's is issued
  16. Jul–Oct 2026Interior demolition, roof and facade permits at the former Rite Aid, 3905

The four May 2024 leases came between T&T's announcement and its opening, which fits an anchor pulling tenants in; no record we found says why.

How this was checked

Checks against this finding

Three properties, not one. The mall, Factoria Village and the smaller centers along SE 38th Street are different properties, so the food count is not a tenant list for the mall or a list of businesses one master plan affects. The plan's boundary is also not the acreage Kimco reports for its own property.

Food permits only. A business without a county food permit isn't here: packaged-food shops, salons, clinics and offices are all missing. Jing Jing Asian Market and Southgate Mart sell groceries but hold food-service permits only, so the zero independent grocers is the weakest number on the page. Permits also outlast the businesses: Jing Jing is counted here but had closed by 16 October. 22 more permit holders were left out because they aren't grocers or restaurants open to the public: six schools and institutions; eleven hotels, fuel and convenience stores, a car wash, a cinema and the corporate cafes on the T-Mobile campus; and five counters inside another store.

Independent is a threshold. Allowing one, three or five King County addresses per name gives Factoria 23, 31 or 32 independents; Eastgate has 10 at every threshold. A hand list moves known chains with few local addresses, T&T among them, into the chain column. All 42 storefronts first counted as independent were checked by hand, and two were moved: Katsu Burger and Mayuri. The check also fixed two rules that had dropped open storefronts, and with those restored the count is 41. Toshi's Teriyaki, counted as a chain, is a close call.

Where Factoria ends. Each permit is placed by its parcel's center inside the city's neighborhood area boundaries, so a business near an edge could fall on either side.

New openings lag. T&T was first inspected about three and a half months after it opened, so a restaurant that opened in the last few months may not appear. The data runs to 14 October 2026.

Cuisine comes from names. Labels were read from business names and, where we found one, a directory description, not from owners. They describe a storefront's food, not who owns it or who eats there. Tea and boba shops are the likeliest to move between groups, and five Factoria storefronts couldn't be placed.

First-seen dates aren't opening dates. The county data starts in January 2021, and a sweep in late 2022 recorded long-running restaurants for the first time. Top Gun's parcel has had the same owner since 2008, so its 2024 date is probably a permit event, not an arrival. The count of four or five new Chinese or Taiwanese arrivals is our reading and could be off by a re-permit either way.

Leased is Kimco's number. The New York owner has interests in about 565 shopping centers as of the end of 2025. Its annual report dates Factoria to 2013 and reports full ownership. Its leased figure counts space under lease, which can include a store that has signed but not opened or one that has closed with rent still owed. We didn't measure it, and Kimco's yearly figures (95.2% and 94.7% in 2023 and 2024) say nothing about when within 2025 the fall happened.

Phases come from the city's 2022 map. Each part of the mall is placed by the phase map approved in January 2022, which is marked preliminary; Phase 1 is also named by the 2024 approval. A phase number says what changes together, not when: the map can't say which shop closes next.

The Phase 1 drawing is ours. The site outline is the city's parcel for 12405 SE 38th Street. As the city's map layer draws it, the parcel measures 234,610 sq ft; the approval and the county assessor both give 229,509 sq ft, so the drawn outline runs slightly large. The building's extent is traced by eye from the approved site plan, so its south edge is approximate, and the crossing on 124th is placed from the approval's words, "at the midpoint of the proposed building's western façade".

The apartment approval is read from the record, not from the city. The expiry rule is quoted from the 2024 approval, and the missing building application is a portal search by street, run on 20 October 2026. A permit filed under another address would change the reading. The city's records office confirmed on 23 October 2026 that it holds no extension, master plan amendment or building permit application tied to the approval.

Retail totals are withheld. An earlier draft said the plan would reduce retail by about a quarter, from the permit description's 525,948 to 406,629 square feet. The 2020 staff report counts differently: its phase tables add hotel and office floor area to retail under "retail and service use" (681,100 square feet at full build-out). The two series measure different things, so no reduction is stated here.

The plans' silence is a text search too. Both existing-conditions reports and the plan drafts were searched in full for a business count, an inventory or a storefront list, and none turned up. Other city files weren't searched.

The county's deletions are a pattern, not a stated rule. The dataset says only that it covers "2021 to the present". That it publishes only active permits is our reading of the 64 that vanished.

The status box is dated. The Council agenda wasn't posted yet on 1 November. The approved January 2022 phase map arrived on 3 November through a public-records request; the phase list below now places each part of the mall. The county's food-permit data is saved again on the first of each month, so this page's counts can be checked against the next copy.

The master plan, Phase 1 and the later phases

A master development plan sets the overall uses, building limits and required improvements for a large site, with detailed approvals still needed for its phases.

  • Approved by the city. Bellevue's Development Services Director approved Kimco's master development plan, 18-105710-LP, with conditions, on 5 November 2020.
  • What the 2020 plan allows. Up to 685 homes. The scheme drawn then had 595 homes, a 150-room hotel of 95,000 sq ft and two office buildings totaling 175,000 sq ft. The ceiling and the drawn scheme are different numbers.
  • How long it lasts. The decision grants ten years of protection under the land-use rules in effect at approval, through 5 November 2030. Each building phase still needs its own design review; the master plan does not keep an individual design approval alive indefinitely.
  • The January 2022 change. The city approved a modification to the phasing that renumbered the phases while staying within the plan's limits and kept every 2020 condition. The approved scheme has 595 homes, a 150-room hotel and 203,384 sq ft of offices; its phases are set out below.
  • No construction schedule. The 2020 decision says its phases do not prescribe a timeline or development sequence: they tie amenities to construction. They cannot say which current shop will close next.

The city counts 25 office buildings in the neighborhood, 15 built in the 1970s and 1980s. Its January 2026 report puts office vacancy along the I-90 corridor, Factoria Boulevard included, at about 42.5%.

Phase 1. The 2024 approval calls the apartments Phase 1 of the master plan; the 2020 design approval for this corner had expired in November 2022. The building is smaller than the 2020 plan's Phase 1, which had 295 homes and 9,795 sq ft of retail.

Approved 2024, after the January 2022 change2020 plan’s Phase 1
Homes265 apartments over 5 floors PDF p.19, p.37295
Shops and officeAbout 4,861 sq ft of shops and 6,367 sq ft of office, both on the ground floor, facing the lot PDF p.19, p.379,795 sq ft of retail
Size and height438,814 sq ft in all; about 73 ft to the top of the elevator overrun, where 75 ft is allowed PDF p.19, p.26
Parking366 stalls in a 5-level garage inside the building; 51 of the 155 stalls in the lot to the south are for the shops and office PDF p.26
StreetsA new signalized crossing on SE 38th St between the two driveways; the 124th Ave SE crossing widened and signalized; a 14-ft-wide walking and cycling path along 124th south of it, extending the I-90 Trail PDF p.40, p.41
Site5.3 acres (229,509 sq ft), the mall’s northwest corner; the 6,900 sq ft restaurant there is demolished PDF p.19, p.37
TimingNo phasing within the building. Design review approved 4 April 2024; the portal lists it as expiring 4 April 2026, and no building permit application turned up on 20 October 2026 PDF p.37, p.46No timeline set

Under the city code the approval cites, a design review approval expires after two years unless a complete building permit application is filed first. The public permit portal lists the design review as closed, with an expiration of 4 April 2026, and a search of the portal on 20 October 2026 found no building permit application at that address since the approval. On 16 October the corner was still parking and the Novilho's building. On 23 October Bellevue's Development Services records staff, answering our public-records request (D002863-101626), said they found no extension, master plan amendment or building permit application tied to the approval since it was granted.

The later phases. The city's January 2022 approval and its phase map, a consultant's site plan from October 2021 marked preliminary, came on 3 November 2026 in answer to our public-records request. The phases now run:

  • Phase 1, the northwest corner at 124th Avenue SE and SE 38th Street: the apartments and the Novilho's building, as above.
  • Phase 2, SE 38th Street at Factoria Boulevard by Bank of America: a turn lane, no buildings.
  • Phase 3, the middle of the mall: the roof comes off a strip of the concourse to make a private street, SE 40th Place, taking out about 38,000 sq ft of shops.
  • Phase 4, the west lot along 124th Avenue SE: restriping and a path for walking and cycling, no buildings.
  • Phase 5, the Chase and Burger King buildings on Factoria Boulevard: reworked, each allowed to grow by up to a fifth.
  • Phase 6, the southeast corner at Factoria Boulevard and SE 41st Place: one restaurant comes down for a 150-room hotel with 98 homes and shops.
  • Phase 7, the south side: the Walmart building, which T&T now fills, and the shops north of it come down for two office buildings of 203,384 sq ft, 202 homes, a garage and an extension of Target.

Employer property records

T-Mobile's headquarters dominates the office district. AAA's headquarters, T&T's supermarket and Newport High School add other kinds of work nearby. These are major workplaces within the city's Factoria boundary, rather than a complete ranking: comparable local headcounts are not published for all of them.

EmployerWhat it does therePeople on siteOffice or buildingAssessed value, 2026
T-Mobile USHeadquarters, Newport Corporate CenterMore than 6,000 (2023)963,469 sq ft, five buildings$200.7 million
AAA WashingtonCorporate offices, first three floors of One Newport—89,347 sq ft, whole building$16.9 million, whole building
Newport High SchoolPublic high schoolNearly 100 staff (2023–24)230,915 sq ft, 12 buildings—
T&T SupermarketGrocery, bakery and prepared food in the former WalmartOver 300 jobs planned (2023)76,207 sq ft$6.3 million

Values are the King County Assessor's, land and buildings together, because a company's market value covers its whole business, not this place. A dash means no figure scoped to this site was found. Sources: the city's January 2026 Factoria report, a King County resolution for T-Mobile's count, T&T's announcement, and the Assessor's records, listed below.

Read 27 October 2026. Areas below are the Assessor's Building Net Sq Ft, which excludes parking structures; they are whole-building figures, not lease measurements. The five campus records total 963,469 net office sq ft. Their 2026 appraised land and improvement values, for tax year 2027, sum to $200,667,000. Newport Tower has two assessment accounts; both are included, including its nontaxable account. The campus includes tenants besides T-Mobile.

BuildingKing County Assessor parcelNet office sq ft2026 land + improvements
Two Newport6067630020165,320$34,432,000
Newport Tower6067630030222,894$46,423,000
Four Newport6067630040155,807$32,451,000
Five Newport6067630050283,179$58,979,000
Newport Terrace6067630060136,269$28,382,000

AAA uses three floors, so One Newport's 89,347 net office sq ft is not a claim about its leased area. T&T's 76,207 sq ft belongs to parcel 1624059310, labelled Former Walmart in the building record; searching only its street address returns a different, land-only parcel. Newport High School's record aggregates 12 buildings and gives 230,915 sq ft; it supplies no tax-roll valuation, so that cell is left blank. None of these records measures daily attendance, current staffing or business value. T&T's over-300 figure is a hiring plan, not an observed headcount. No current Factoria employer ranking with comparable local counts was found in the city report, company material, WA ESD or PSRC searches; statewide lists cannot supply one.

Their share of the 7,800 jobs is unresolved. The city report gives 7,800 as T-Mobile's employment on page 35, while page 5 uses it for Factoria as a whole. The older headquarters count and T&T's hiring plan can't settle that overlap, so the page doesn't turn them into a percentage. Hubbard Radio's studios (17,540 sq ft, a builder's 2017 fit-out record) sit in Newport Tower, already inside the T-Mobile campus figures, so they are not a separate row.

Food permits: 74 storefronts in Factoria and Eastgate

The 15 October 2026 county inspection snapshot lists 54 food-business records in Factoria and 20 in Eastgate under this page's classification rules. They cover both the mall and surrounding centers. They are a permit baseline, not a confirmed count of open shops: Jing Jing, for example, was still in the snapshot but its window notice showed it closed on 16 October. Independent here means a business with three or fewer addresses in King County that isn't a known chain.

AreaKindIndependentChainTotal
FactoriaGrocery033
FactoriaRestaurant302050
FactoriaBakery101
EastgateGrocery011
EastgateRestaurant10919
Both413374

As of the county's 15 October 2026 snapshot; the next copy is taken 1 November.

Read from their names, ten of Factoria's 54 are Chinese and two are Taiwanese. Two of those twelve are chains, T&T and Panda Express, so Chinese or Taiwanese businesses make up 10 of Factoria's 31 independents. That's the largest single group, about a third, but not a majority. Nine more of Factoria's 54 are Japanese or Korean, five are other Asian, 23 aren't Asian, and five we couldn't place. Eastgate has no Chinese or Taiwanese storefront and four Japanese or Korean ones. Crossroads, counted the same way, has 7 Chinese storefronts of 62 and no Taiwanese one.

The county's public record drops businesses, history and all

Between two copies of the county's Eastside inspection data, taken on 26 August and 15 October 2026, 64 permits vanished, each with its whole inspection history. Tofu 101's permit, at 12816 SE 38th St, Unit G, was one: last inspected on 6 November 2025, then gone from the October copy, where a new permit under the name Hej Hej holds the same unit, first inspected on 28 September. On 16 October the storefront still said Tofu 101, its door was open and an Excellent placard was in the window. So a vanished permit isn't always a closed business, and the public data shows who holds a permit now but can't show who was here before a phase begins. This site has kept copies since August and now saves one on the first of each month, so this list can be set beside the next.

The 74 storefronts, by the name on their permit

Names are as the permit gives them, with store numbers and legal suffixes dropped. County addresses is the number of addresses in King County holding a permit under the same name.

Name on permitAreaKindOwnershipCounty addresses
Arepa Venezuelan KitchenFactoriaRestaurantIndependent2
BoriFactoriaRestaurantIndependent1
Chi ChiFactoriaRestaurantIndependent1
Dim Sum FactoryFactoriaRestaurantIndependent1
Greek PitaFactoriaRestaurantIndependent2
Hej HejFactoriaRestaurantIndependent1
I Love PhoFactoriaRestaurantIndependent1
Jing Jing Asian MarketFactoriaRestaurantIndependent1
La'BeanFactoriaRestaurantIndependent1
Lee Kitchen FactoriaFactoriaRestaurantIndependent1
Mama's KitchenFactoriaRestaurantIndependent1
Mixify CoffeeFactoriaRestaurantIndependent1
MusashiFactoriaRestaurantIndependent2
NorthFactoriaRestaurantIndependent1
Novilho's BrazilianFactoriaRestaurantIndependent1
Over the RainbowFactoriaRestaurantIndependent2
Regent BakeryFactoriaBakeryIndependent2
Restaurant El TapatioFactoriaRestaurantIndependent1
Shanghai HouseFactoriaRestaurantIndependent1
Simply IndianFactoriaRestaurantIndependent1
Southgate MartFactoriaRestaurantIndependent1
Square LotusFactoriaRestaurantIndependent1
Sushi Omiya ExpressFactoriaRestaurantIndependent1
T4 Tea For UFactoriaRestaurantIndependent1
Tasty ThaiFactoriaRestaurantIndependent1
Teriyaki TimeFactoriaRestaurantIndependent3
Thai GingerFactoriaRestaurantIndependent2
Tian Fu BellevueFactoriaRestaurantIndependent2
Tian Fu ExpressFactoriaRestaurantIndependent1
Tokyo Japanese RestaurantFactoriaRestaurantIndependent1
Top Gun Seafood RestaurantFactoriaRestaurantIndependent1
Applebee's Neighborhood Grill & BarFactoriaRestaurantChain8
Burger KingFactoriaRestaurantChain18
Chipotle Mexican GrillFactoriaRestaurantChain27
Coldstone CreameryFactoriaRestaurantChain1
EvegreensFactoriaRestaurantChain1
Ezell's Famous ChickenFactoriaRestaurantChain5
Great Harvest BreadFactoriaRestaurantChain1
Jimmy John'sFactoriaRestaurantChain12
Just PokeFactoriaRestaurantChain15
Katsu BurgerFactoriaRestaurantChain2
KFCFactoriaRestaurantChain9
McDonald'sFactoriaRestaurantChain43
MOD PizzaFactoriaRestaurantChain10
Panda ExpressFactoriaRestaurantChain18
Panera BreadFactoriaRestaurantChain11
QFCFactoriaGroceryChain38
Starbucks CoffeeFactoriaRestaurantChain116
SubwayFactoriaRestaurantChain89
T&T SupermarketFactoriaGroceryChain1
Taco BellFactoriaRestaurantChain25
Taco TimeFactoriaRestaurantChain31
TargetFactoriaGroceryChain11
Toshi's TeriyakiFactoriaRestaurantChain7
Crab SeasonEastgateRestaurantIndependent1
DaehoEastgateRestaurantIndependent1
India Gate RestaurantEastgateRestaurantIndependent1
Island Blends Acai and PokeEastgateRestaurantIndependent1
Jang An PartnersEastgateRestaurantIndependent1
Kuro SushiEastgateRestaurantIndependent1
Last Frontier CoffeeEastgateRestaurantIndependent1
Lil Jons RestaurantEastgateRestaurantIndependent1
Sister's DeliEastgateRestaurantIndependent1
Teriyaki & MoreEastgateRestaurantIndependent1
DQ BellevueEastgateRestaurantChain1
Jack in the BoxEastgateRestaurantChain32
Just PokeEastgateRestaurantChain15
Mayuri Bakery and VideoEastgateRestaurantChain1
McDonald'sEastgateRestaurantChain43
Outback SteakhouseEastgateRestaurantChain2
Pagliacci PizzaEastgateRestaurantChain22
SafewayEastgateGroceryChain54
StarbucksEastgateRestaurantChain8
Starbucks CoffeeEastgateRestaurantChain116
Sources (49)

Sources

Drafted 15 October 2026; employer and property records read 27 October 2026; earlier status checks dated below.

  1. King County food establishment inspection data (Socrata r878-4sxa), copies of 26 August and 15 October 2026.
  2. City of Bellevue neighborhood areas layer.
  3. Factoria and Eastgate Existing Conditions reports (January 2026).
  4. Draft Factoria and Eastgate neighborhood area plans, staff reports and agenda memos for the 23 September 2026 Planning Commission hearing.
  5. The city's Great Neighborhoods page.
  6. Master plan decision 18-105710-LP, 5 November 2020 (linked in the master-plan section); design review 22-130386-LD, 4 April 2024.
  7. USDA NAIP aerial photography of 7 October 2023 (Microsoft Planetary Computer).
  8. City of Bellevue parcel layer, read 20 October 2026.
  9. T-Mobile US annual report on Form 10-K for 2025, filed 11 February 2026, for its headquarters address.
  10. Kimco annual reports; Kimco's quarterly supplemental for the second quarter of 2026 (p.29, "Long Term Entitled Opportunities").
  11. History: Eastside Heritage Center, "Sunset Shopping Center" (January 2021) and its Factoria posts; Seattle Times, 8 December 1993 (annexation), 10 November 1998 (anchors and face-lift) and 24 December 2004 (sale to Kimco); Bellevue Reporter, 10 October 2012 (Walmart).
  12. King County assessor sale histories.
  13. Press coverage of T&T's opening.
  14. Shopping Center Business, "Kimco adds nine tenants to shopping centers in Washington" (20 May 2024).
  15. The city's Factoria engagement report (Mid-Autumn Festival).
  16. Bellevue permits 23-108497-BZ, 25-120932-BZ, 25-126764-BZ, 26-116964-BE, 26-121182-BZ, 26-122466-LJ and 26-123463-BZ.
  17. The January 2022 land-use exemption 21-110040-LJ.
  18. Amazon Fresh's last day: AP, January 2026.
  19. Amazon Fresh's last day: GeekWire, January 2026.
  20. Events: bellevue.com's 2025 Lunar New Year listing.
  21. Events: Amazon's page on the 2026 Lunar New Year celebration.
  22. Events: Little Masters Club's Moonlight Melodies listing.
  23. Events: the city's 2025 Community Programming Fund list.
  24. Events: the Merry K-ristmas Market listing.
  25. Events: Seattle's Child on Halloween Factoria 2026.
  26. Shops, services and venues around the mall: Kimco's 2025 property list for its major tenants.
  27. Shops, services and venues around the mall: OpenStreetMap contributors, read 20 October 2026 (ODbL), for names and addresses, which we have not checked storefront by storefront.
  28. Shops, services and venues around the mall: operator page for Target.
  29. Shops, services and venues around the mall: operator page for Swedish Factoria Primary Care.
  30. Shops, services and venues around the mall: operator page for Funtastic Playtorium.
  31. Shops, services and venues around the mall: operator page for Monster Mini Golf.
  32. Shops, services and venues around the mall: operator page for Goldfish Swim School.
  33. Shops, services and venues around the mall: Bellevue permit 26-116964-BE for the former Rite Aid space's address.
  34. Map labels: City of Bellevue neighborhood areas, school sites and parcel layers, read 20 October 2026.
  35. Map labels: AMC Factoria 8 from its King County food permit at 3505 Factoria Blvd SE.
  36. Direct status checks on 19 and 20 October 2026: Great Neighborhoods schedule and 2025 adoption history.
  37. Direct status checks on 19 and 20 October 2026: 2024 apartment approval.
  38. Direct status checks on 19 and 20 October 2026: design-review portal record.
  39. Direct status checks on 19 and 20 October 2026: Kimco's 2025 property list.
  40. Factoria Existing Conditions, January 2026, pp.5, 13 and 35; neighborhood jobs, office stock, T-Mobile, AAA and Newport High School; read 27 October 2026. The job figures have the overlap described above.
  41. King County Flood Control District resolution FCD2023-02, March 2023, headquarters employment; read 27 October 2026.
  42. AAA Washington, About Us, corporate services and 2016 Factoria move; read 27 October 2026.
  43. T&T's 8 June 2023 announcement, store use and planned jobs; read 27 October 2026.
  44. Hubbard Seattle, studios, services and suite address; read 27 October 2026.
  45. Gateway Construction's Hubbard Radio project, 2017 fit-out area; read 27 October 2026.
  46. King County Assessor eReal Property records, read 27 October 2026: five campus parcels linked in Employer property records; One Newport, 6067630010; T&T's former Walmart building, 1624059310; Newport High School, 1624059023. Values are 2026 appraisals for tax year 2027 where present, not the GIS layer's older values.
  47. Bellevue Development Services records staff, public-records request D002863-101626, filed 16 October 2026, replies 20 and 23 October and 3 November: application drawings supplied; no later Phase 1 extension, amendment or building application found; the city's 25 January 2022 phasing approval supplied on 3 November (phase table PDF pp.3–9, phase map p.10).
  48. Phase 1 drawing references in the 2024 approval: bird's-eye views PDF pp.19–20; site plan p.21; elevations pp.22–23; landscape p.30; public gathering space p.33; architect's sheets pp.61–70. The 2020 comparison is on p.37; the next phase's eastbound turn lane is on p.38. Commercial areas use the itemized pp.19 and 26 rather than p.37's rounded figure.
  49. T-Mobile's Bellevue HQ building directory, read 27 October 2026, matches the five campus addresses to the Assessor parcels used above. Live parking figures are not used as an employment count.

Updates and corrections.

Updated 3 Nov 2026. Added the approved 2022 phase map: which part of the mall falls in each phase, including offices planned for T&T's building.

New stories from Bellevue, in your inbox

One email when a new story is published, with any corrections. Nothing else.